Fittings vary by colour. Please see Materials & Craftsmanship below
Multipurpose Soft Leather Long Lead
Multipurpose Soft Leather Long Lead
Couldn't load pickup availability
Adjustable Soft Leather Long Lead | Handmade in England
Part of the Dogs & Horses leather collection, this rolled soft leather training lead is designed for versatility, control and everyday durability.
Crafted from supple European leather, it offers a smooth, comfortable feel in the hand while remaining strong and hard-wearing. Inside, a high-strength rope core provides exceptional durability and will not rot if exposed to water, making it reliable in all weather conditions.
Designed with functionality in mind, the lead features a clip at each end, allowing for adjustable lengths of up to approximately 6 feet and beyond. It can be worn over the shoulder for hands-free walking or secured easily when needed, making it a practical choice for training, travel and everyday use.
Available in a range of classic country colours, each piece is handmade in England by Dogs & Horses using traditional techniques and materials chosen for long-lasting performance.
Sizing
Sizing
The rolled soft leather training lead measures approximately 225cm (7ft+) end to end and can be adjusted to a variety of lengths depending on how it is configured.
Available in three thickness options:
Small (approx. 8mm thick)
A lighter, slimmer version with proportionally smaller fittings, ideal for smaller dogs or those who prefer a less bulky lead.
Standard (approx. 10mm thick)
A versatile, everyday option suited to most medium to larger dogs.
Large (approx. 12mm thick)
A thicker, more substantial lead with heavier-duty fittings, designed for larger or stronger dogs.
Materials & Craftsmanship
Materials & Craftsmanship
Crafted from soft European leather, selected for its durability, comfort and natural strength. The leather is designed to be hard-wearing and weather-resistant, while remaining supple in the hand.
Internal polyester cord is load-bearing into the hundreds of kilograms
The leather is colour-fast, meaning it will not transfer dye onto your dog’s coat under normal use.*
Each lead is finished with solid load-bearing hardware, available in either solid brass or silver-tone fittings depending on the colour chosen.
Hardware Finish
• Colours including Red, Pink, Orange, Purple, Grey, Blue and Bright Green are supplied with silver fittings
• Colours including Brown and Tan are supplied with brass fittings
• Black is available with either brass or silver fittings. Please add a note with your preference at checkout.
All fittings are designed to provide reliable strength and security, ensuring your dog remains safely attached at all times.
*Avoid contact with chemicals from liquid flea treatments, as these may affect the leather.
Care guide
Care guide
All Dogs & Horses leather products are crafted from high quality European leather, chosen for its durability, comfort and natural beauty. With the right care, leather will soften, develop character and last for many years.
Cleaning
To maintain the leather’s natural finish, clean occasionally using a leather cleaner, saddle soap, or dubbin. Apply with a soft cloth or sponge and gently remove any dirt or residue.
For light cleaning, a damp cloth with a mild, non-abrasive cleaner can also be used. Always test cleaning products on a small, inconspicuous area first to ensure the colour remains stable.
Conditioning
After cleaning, apply a leather conditioner or restorative such as Neat’s Foot Oil or a beeswax-based product (for example Renapur or Leather Genie).
Conditioning helps restore the leather’s natural lustre, keeps it supple, and protects it from drying out or cracking.
Water & Drying
Leather can tolerate occasional exposure to water, but it should not remain wet for extended periods.
If your item becomes wet, allow it to air dry naturally at room temperature. Do not place leather items on radiators or near direct heat sources, as this can cause the leather to stiffen or crack.
Once dry, applying a leather conditioner will help restore flexibility and protect the surface.
Metal Hardware
Brass hardware may naturally develop a darker patina over time, sometimes referred to as “living brass”. Many owners appreciate this as part of the character of real brass.
If preferred, brass or metal fittings can be polished with a metal cleaner such as Brasso. Take care to keep cleaning products away from your dog or horse and avoid inhalation of fumes.
Regular Inspection
We recommend regular hands-on inspection of all leather items to check for wear and tear, particularly around stitching, buckles and clips. Routine care helps ensure the continued comfort and safety of your animal.
Important
Avoid allowing leather to come into contact with chemical products, including spot-on flea treatments, as these may damage the leather or cause colour transfer. This applies to all leather surfaces.
Delivery
Delivery
Every Dogs & Horses product is handmade with care. Please allow 2-10 business days for the making and sending of your item.
You will receive a confirmation email as soon as your delivery is on it's way.
Delivery costs are calculated at checkout based on your location and order size.
Cancellations
Cancellations
If you change your mind, please contact us within 24 hours of placing your order at hello@ellisandlane.co.uk
As most items are made to order, cancellations after this time may not be possible.
Returns
Returns
If something isn’t quite right with your order, please contact us first at hello@ellisandlane.co.uk and we will be happy to help.
If the goods you receive are unsuitable, please let us know within 28 days of delivery. Items may be returned for a replacement or a refund, provided they are unused and in their original condition. Customers are responsible for the cost of return postage for unsuitable items.
Please note that unless an item is faulty, we are unable to refund return postage costs for reasons relating to personal preference, including the finish of the product, the metal fittings used, or slight colour variations, as colours may appear differently depending on your screen.
Once a returned item has been received and processed, refunds will be issued to the original payment method and typically appear in your account within 5–10 business days.
If your goods arrive damaged or faulty, please contact us within 28 days of delivery so we can resolve the issue as quickly as possible. We will arrange a repair or replacement where appropriate, or offer a full refund. In these cases, we will cover reasonable return postage costs.
About the maker
About the maker
This product is made by Dogs & Horses, a British brand specialising in beautifully crafted leather dog accessories designed for everyday adventures with dogs.
At Ellis & Lane, we carefully select brands that share our focus on quality, practicality and timeless design.

Why you'll love it
✔ Handmade in London by British brand Dogs & Horses
✔ Premium leather construction
✔ Durable hardware built for everyday use
✔ Comfortable and practical for daily use
✔ Timeless British styling